$2500 FREE FREIGHT PROGRAM is for supplies, repair parts and whole goods. Tanks, pipe, sprayers and other large equipment are not included in this program. Applies to Continental U.S. ground shipments only.

Call for details! 1-888-677-5054

Close

Dultmeier Sales will be closed Thursday, November 24th and Friday, November 25th in observance of Thanksgiving

Dultmeier Sales will be closed Monday, December 26th.
Normal operations will resume Tuesday, December 27th. We wish you and your family a very Merry Christmas!

Dultmeier Sales will be closed Monday, January 2nd in observance of
New Year's Day

Dultmeier Sales will be closed Monday, July 3rd and Tuesday, July 4th in observance of Independence Day.
Normal operations will resume Wednesday, July 5th. We wish you a happy 4th of July!!

We are experiencing some technical difficulties on dultmeier.com and apologize for any inconvenience.
If you are running into issues, please phone your order in to 1-888-677-5054

Customer Pickup Orders: to help reduce exposure for our customers and our employees, if you are placing an order for in-store pickup please call in your order ahead of time or place your order online and pre-pay with a credit card. Be sure to let us know when you plan to arrive. We will have your merchandise ready for you and will greet you outside our facility. Thank you for your help!

Due to the impending winter storm Wednesday afternoon and Thursday, ASAP Express is cancelling all operations effective noon Wednesday until midnight Thursday.

Salt Brine Production System Specs

It is the intent of this Specification to describe in detail an Ultra Easy-Clean Out Brine Production System. This system shall be designed and constructed to convert rock salt to finished salt brine. It shall also include a self-contained hydraulic system to rotate the lower brine holding tank and trash screen down when cleaning is desired, allowing all debris in the salt hopper to simply flow into a standard 2 or 3 cu. yd. loader bucket. Total clean-out will only take approximately 10-15 minutes and requires no personnel entry into the system for shoveling and no "quick attach" loader buckets.


Salt Brine Maker Breakdown

I. General

  1. The BPS3000 Brine Production System shall be capable of producing approximately 3,000 Gallons of Brine Per Hour (based on owner's water supply of 50 GPM or more).
  2. System shall be designed and constructed to be easily filled with rock salt using a standard 2 cu. yd. or 3 cu. yd. loader bucket (no conveyors or augers required).
  3. System shall be designed and constructed to be easily cleaned of all debris in the salt hopper with a standard 8' wide 2 cu. yd. or 3 cu. yd. loader bucket (no "quick attach" loader buckets are required). To do this, the loader operator will simply position his loader bucket below the system's lower brine holding tank. He will then switch on the system's self-contained hydraulic control Power Pack. The operator will then rotate the pivoting trash screen and lower brine holding tank down, allowing all debris in the salt hopper to flow into the loader bucket.
  4. System shall also be designed and constructed to provide for easy clean out of the silt and other fines inside the lower brine holding tank as follows: The operator will again rotate the system's lower brine holding tank down, this time with the pivoting trash screen held in the "up" position. He will then remove the secondary screen inside the lower brine holding tank and wash out the silt and other fines using a standard water spray hose.
  5. Entire system shall be constructed on a single skid frame to allow for easy loading, unloading, and moving using various loaders with forks (system can also be lifted into place).
  6. System shall be a "downward flow" brinemaker where the salt bed acts as a "filter bed" as the water moves down through the bed from the top spray bars. This provides for cleaner brine (less suspended solids in the finished brine) than upward flow brinemakers produce.
  7. Overall system dimensions are: 10'9" wide x 6'1" deep x 8'0" high.

II. Upper Salt Hopper

  1. The Upper Salt Hopper shall have an approximate capacity of 6 1/4 cu. yds. of rock salt. It shall be 120" (10'0") wide by 63" (5'3") deep at the top to allow for easy loading with rock salt with 2 or 3 cu. yd. loader buckets. The back side of the hopper shall be angled forward (tapered). There shall also be inward tapers on the left and right sides of the lower portion of the salt hopper.
  2. The Upper Salt Hopper shall be constructed of 10 gauge, 304 stainless steel.

III. Pivoting Trash Screen

  1. A 14 gauge 304 stainless steel trash screen shall be located at the bottom of the hopper. This screen shall have approx. 1/4" dia. circular holes through it. The screen shall be hinged on its back side and have a securing device on its front side so it can rotate down with the Lower Brine Holding Tank, or be secured in the up position for additional cleaning of fines from the Brine Tank.

IV. Lower Brine Holding Tank

  1. The Lower Brine Holding Tank shall be constructed of 10 gauge, 304 stainless steel.
  2. 304 stainless steel support members shall run across the Lower Brine Holding Tank at proper spacing to provide support for the trash screen above.
  3. A 16 gauge 304 stainless steel secondary screen shall be located approximately 6-8" from the bottom of the Lower Brine Holding Tank. This screen shall have approx. 1/8" dia. circular holes through it. The screen shall be removable for cleaning purposes.
  4. A 2" stainless steel female thread bung or coupling shall be welded into the back side of the Lower Brine Holding Tank.
  5. The back side of the Lower Brine Holding Tank shall be hinged and also have locking pins on the left and right front sides so it can rotate down and back up again (for cleaning purposes).
    The back hinges/sleeves and front locking pins/sleeves shall be 304 stainless steel. The torsion bar on the back side of the Lower Brine Holding Tank shall also be 304 stainless steel.
  6. Lower Brine Holding Tank shall hold approximately 150 gallons and shall have a forward taper on its back side. It shall be approx. 94" (7'10") across its front so a standard 2 cu. yd. or 3 cu. yd. front end loader bucket can be easily positioned underneath it.

V. Skid Frame

  1. Skid Frame shall support all other system components including the Upper Salt Hopper, Lower Brine Holding Tank, hydraulic system, brine discharge pump, plumbing, and electrical control panel.
  2. The entire Skid Frame shall be constructed of structural stainless steel tubing, 3" x 3" x 3/16".
  3. The Skid Frame shall have 3" x 3" x 3/16" structural stainless steel bottom cross beams on each side and two across the rear. These cross beams will be located approx. 6-8" above the floor to enhance floor cleaning. The Skid Frame shall also have a 3" x 3" x 3/16" structural stainless steel front cross beam welded to the frame to support the locking pins for the Lower Brine Holding Tank and trash screen.
  4. Skid Frame shall also have 3" x 3" x 3/16" structural stainless steel cross beams running across the top on the front, back & both sides. It shall also have 3" x 3" x 3/16" structural stainless steel beams running diagonally on both sides.
  5. Each vertical leg of the skid frame shall also have stainless steel base feet (pre-drilled) for securely anchoring the skid frame to the floor.
  6. Stainless steel lifting lugs are provided on all four corners of the skid frame so an overhead or portable crane can be used for lifting and positioning the system.
  7. The entire Skid Frame is also offered in 3" x 3" x 1/4" carbon steel structural square tubing (Optional Bid Item-DU BPS3000). This carbon steel skid frame will be pre-cleaned with phosphoric acid & steam heat (to "etch" the steel for better paint adhesion), blown dry, and painted with a two-part epoxy primer followed by a two-part urethane top coat.

VI. Hydraulic System

  1. Hydraulic System for rotating the Lower Brine Holding Tank & trash screen down and up shall be completely self-contained (no hydraulic lines or connections required by owner).
  2. Hydraulic System shall include a hydraulic pump with integral reservoir. The hydraulic pump shall be operated by a close-coupled 1 HP, 220V, 1 Phase, Totally Enclosed (TENV) electric motor (1 HP at 30 minute duty cycle; 2.5 HP at 5 minute duty cycle). The system shall also include a pressure relief valve. Two 2-1/2" dia. hydraulic cylinders shall also be included, sufficient in size to rotate the Lower Brine Holding Tank. The cylinders shall be securely pinned to the Lower Brine Holding Tank. A hydraulic control valve shall also be included to retract and extend the hydraulic cylinders. Proper hydraulic tubing and fittings shall also be included to provide a complete & fully operational system. Hydraulic tubing shall be steel with zinc plating with a 24 hour salt spray rating. Hydraulic fittings shall be JIC steel fittings with yellow di-chromate finish with a 96 hour salt spray rating.

VII. Brine Discharge Pump

  1. Pump shall be 2" x 1-1/2" straight centrifugal constructed of 316 stainless steel (housing, impeller & mounting feet) with viton/carbon/ceramic mechanical seal. Pump shall be close-coupled to a 3 HP, 220V, 1 Phase, TEFC motor.Pump shall be capable of producing a maximum flowrate of 150 GPM and also 80 GPM at 62' total dynamic head (TDH).

VIII. Discharge Plumbing

  1. Discharge plumbing shall make maximum use of polypropylene valves & pipe fittings (with stainless steel suction manifold) for corrosion resistance and quick & easy maintenance.
  2. Suction plumbing to the Brine Discharge Pump shall include a 2" EPDM suction hose (wire reinforced) with 2" check valve (on the Lower Brine Holding Tank port). It shall also include a 2" valve and camlock male adaptor for pulling finished brine from a storage tank hose. It shall also include a 3/4" fresh water inlet valve.
  3. Discharge plumbing from the Brine Discharge Pump shall include a 2" valve & camlock male adaptor for storage tank hose hook-up. It shall also include a 3/4" valve for sampling the finished brine concentration.

IX. Water Inlet & Spray Bar Plumbing

  1. Water inlet plumbing shall include a 2" polypropylene valve (1-1/2" I.D.) with 2" camlock male adaptor for water inlet hose hook-up. It shall also include PVC, Sch. 80 piping running through both the front and back sides of the Upper Salt Hopper.
  2. The water spray pipes (PVC) shall run along the entire length of the front and back sides along the top rim of the Upper Salt Hopper. They shall have drill holes at proper spacing and size to concentrate solid streams of water onto the salt pile in the Upper Salt Hopper.
  3. Two 1-1/2" polypropylene swivels will be installed in the water inlet plumbing just outside the entry point of the PVC pipes into the Upper Salt Hopper. These swivels will allow the operator (with special tool provided) to rotate the water spray pipes at least 45 degrees while standing on the ground. This will allow for continued concentrating of the solid streams of water onto the salt pile even when the pile height is being reduced (when preparing for clean-out).
  4. A 2"-24V electric ball valve (1-1/2" I.D.) shall be included in the water inlet plumbing. This valve will be automatically closed when the float switch in the Upper Salt Hopper or Lower Brine Holding Tank is activated (indicating that the water inflow rate is faster than the brine pump discharge rate, or that it may be "time to clean" the system). An indicator light on the system control panel will also turn on when this water inlet valve is closed to alert the operator to either reduce the water inflow rate, or allow the system to automatically self-regulate if he chooses.

X. System Control Panel

  1. The System Control Panel shall include a NEMA 4X (weathertight) hinged, fiberglass, gasketed enclosure securely mounted to the skid frame.
  2. Panel shall also include power disconnect switch with lock-out/tag-out, motor control, 220/24V transformer, waterproof switches (wired 24V) including "auto" switch, pump only switch, and hydraulic system switch with indicator lights. Panel also includes an indicating "time to clean" light and an indicating "reduce flow" light. Panel shall also be wired to four float switches: one to shut off the brine pump should the brine level drop too low in the Lower Brine Holding Tank (to protect the pump from running dry), two more to shut off the electric water inlet valve (when water inflow rate is faster than brine pump discharge rate; one in the Lower Brine Holding Tank and one in the Upper Salt Hopper), and one to indicate "time to clean" (in the Upper Salt Hopper).
  3. Panel shall be wired with overload protection and ready to receive 220V, 1 Phase power (power supply to panel to be direct wire in proper conduit, by owner's electrician).
  4. Electrical System shall also include flexible conduit with liquid-tight connectors from the Control Panel to the brine discharge pump and hydraulic system pump motor.

XI. Other Safety/Operational Features

  1. System shall also include a "Time to Clean" flashing beacon which will be activated by a float switch inside the Upper Salt Hopper. The flashing beacon will activate any time the water level inside the Upper Salt Hopper rises to a pre-determined level, indicating that the system may be ready for cleaning.
  2. System shall include two round "Sight Windows" in the Upper Salt Hopper. These windows will be constructed of Lexan and are positioned so the operator can see the salt level in the Upper Salt Hopper from the floor, once the salt level lowers.
  3. Both the "Time to Clean" system and the "Sight Windows" provide key safety advantages in addition to operational advantages in that no ladders will be required to check the salt or water level in the Upper Salt Hopper, or to determine when it is "Time to Clean" the system.
  4. System shall include two 14 gauge 304 Stainless Steel Perforated Safety Shields (one on each end of system).

XII. Manuals

  1. One Installation & Operation Manual shall be supplied with each system delivered (copies available at no additional cost).
  2. Plumbing & Wiring Schematics shall be included in the manual.

XIII. Warranty

  1. Warranty shall begin at time system(s) are delivered.
  2. Warranty shall be for one year, including all system components & parts (labor by owner; not included).
  3. See Owner's Manual for complete safety, operational, and warranty information.

XIV. Optional Items

  1. A remote stop-start pump switch with 52' SJO cord, SPST rubber boot switch, 24Volt can be provided at additional cost.
  2. A complete accessories plumbing kit to connect the Brine Production System to a brine storage tank including 100' of 2" EPDM suction/discharge hose, necessary 2" polyprop. fittings and camlock couplers, one 1" in-line digital flowmeter (for precise measurement when adding water for salinity adjustment), 25' of 3/4" water hose, stainless hose clamps, two 2" stainless steel ball valves and 2" stainless nipples (for the brine storage tank)-DU 1B020 or DU 1B020SS (similar kit with stainless pipe fittings and three 2" x 25' pre-coupled hose assemblies with stainless camlock couplers) can be provided at additional cost. Includes plumbing diagram for quick and easy installation. Other accessory plumbing kits are also available.
  3. A complete plumbing kit to filter brine on the way to storage (located between the Brine Production System & storage tank) including the following: two 1-1/2" "self-cleaning" line strainers with 100 mesh stainless screens (50 & 80 mesh also available), plumbed in parallel with four 2" polypropylene ball valves, and all necessary 2" polypropylene tees, elbows, nipples and camlock male adaptors (ready to receive 2" camlock coupler hose connections each end)-DU BFS2 (threaded fittings) or DU BFS1 (2" full port flanged fittings). Includes plumbing diagram for quick & easy installation. Optional stainless steel wall mounting bracket is also available.
  4. On-site training can also be provided at additional cost (phone support during installation and training is provided free of charge).